Steel furnace operation knowledge and precautions
2018-07-12
Steel furnace operation knowledge and precautions
 
First, preparation before warming up:
 
1. Check if each solid state relay is connected virtually;
 
2. Check if the parameter settings on the touch screen are correct.
 
3. Whether the connection between the front and rear furnace doors and the drive shaft is normal;
 
4. Is the photoelectricity of the upper and lower stations normal?
 
5. Whether the furnace body and the transmission O-ring of the wind grid are normal;
 
6. Whether the furnace body and the encoder of the wind grid are normal (visual inspection);
 
7. Is the voltage of the battery normal?
 
8. Is the air compressor normal?
 
9. Whether the upper air switch of the solid state relay is closed;
 
10. Go through the empty process and watch the touch screen for alarm status;
 
11. Start heating up after normal, and use matrix heating to raise the temperature to avoid full heating.
 
Second, the precautions before running the tempering furnace:
 
1. When the system is running, you will hear the venting sound of the rear door solenoid valve twice, and the rear door will perform the opening and closing actions once, otherwise it is not normal;
 
2. Check if the touch screen has an alarm status and follow the prompts to solve it;
 
3. Cover the photoelectric switch of the upper stage with your hand and take a glass of glass to see if it is normal. Note that when the glass is released, the rear door will perform an opening and closing action. After that, the alarm will sound and the rear door will open. The glass is baked; normal production is observed after normal operation, and the production is in a fully heated state;
 
Third, the touch screen parameter settings:
 
1. Temperature setting: For 4, 5, 6 mm glass, the upper furnace set temperature is 710 degrees, the lower furnace set temperature is 700 degrees; for 8, 10 mm glass, the upper furnace set temperature 700 degrees, the lower furnace set temperature is 690 degrees; for 12,15,19 mm glass, the upper furnace set temperature is 690 degrees, the lower furnace set temperature is 680 degrees;
 
2. Setting of tempering and cooling air pressure: For 4, 5, 6 mm glass, the tempered wind pressure takes a large value, the blowing time is “conversion time”, the cooling time is small, and the blowing time is the total blowing time minus "conversion time";
 
3. Stepping into the film: the stepping value of the film is 3 seconds, which is a fixed value. It does not need to be changed, which is the number of seconds the inverter is rotating.
 
Fourth, other notes:
 
1. The DC protection button of the console must be pressed in unison to keep the circuit connected, otherwise the DC protection will not work after power failure;
 
2. When there is a power outage during production, press the “DC Strip” button on the windshield operation panel for the first time, and let the glass in the furnace drain to the lower platform to the ground;
 
3. When the glass in the furnace breaks during production, you must press the “furnace failure” button for the first time. The action at this time is: the rear furnace door is opened, the furnace body, the wind grid, and the lower table roller are rotating forward to make the glass Discharge to the ground; press the furnace fault button to reset it after completion. Note that when you enter the furnace again, you must press the system to stop at the touch screen, and then press the system again before you can produce normally. Otherwise, Can't enter the glass;
 
4. When the windshield breaks, the glass must be broken. You must press the “window fault” button. At this time, the windshield roller stop stops. If the glass of the windshield is not desired, press the “window fault” button again. The damper is closed to stop the blowing, and the action at this time is that the wind dam is advanced in advance, and then the damper is pressed to cause the glass on the wind slab to fall;
 
5. Note: The windshield debris must be disposed of properly after production.
CONTACT US

TEL:13812633032(同微信) 17503077662(whatsapp)

FAX:0757-81992352

EAMIL: [email protected]

No. 5, Jingang Avenue, Baini Town, Sanshui District, Foshan City, Guangdong Province

主站蜘蛛池模板: 国产综合一区二区 | 日本啪啪片 | 欧美亚洲国产成人高清在线 | 国产精品va免费视频 | 日本三级成人午夜视频网 | 日韩二三区| 国产青草亚洲香蕉精品久久 | 2021国产精品视频 | 三级黄色片在线观看 | 欧美国产日韩综合 | 日本一级一片免在线观看 | 成人午夜小视频 | 日本专区| 日本高清h色视频在线观看 日本高清v | 精品亚洲视频在线 | 欧美 另类 精品一区视频 | 欧美天堂在线视频 | 欧美不卡| 久久精品久久久 | 国产欧美国产精品第一区 | 国产高清美女一级a毛片久久w | 国产偷国产偷亚洲高清人乐享 | 欧美一级免费在线观看 | 男女做视频网站免费观看 | 精品毛片视频 | 手机看片1024久久香蕉 | 欧美成人看片黄a免费 | 在线免费观看国产精品 | 一区二区精品视频 | 免费高清欧美一区二区视频 | 波多野结衣视频免费观看 | 一级毛片免费观看不卡视频 | 日韩不卡视频在线 | 免费播放欧美毛片欧美a | 日本在线免费播放 | 国产欧美一区二区三区免费看 | 综合亚洲网 | 国产性生交xxxxx免费 | 欧美视频综合 | 久久综合在线 | 亚洲欧美日韩另类在线专区 |